Synchronous AC alternators 8 - 30 kVA
The smallest machines in the range, where the frame, the phase arrangement and the starting current decide the build.
8 - 30 kVA · 50 Hz / 60 Hz · 2 or 4 pole · Shunt/PMG
Single-bearing on an SAE flange, or double-bearing on a coupling. The two mounting arrangements
What this band covers

| Indicator | Parameter |
|---|---|
| Power range | 8 - 30 kVA |
| Frequency | 50 Hz / 60 Hz |
| Rated voltage | 50 Hz: 400/230 V, 415/240 V, 380/220 V, 220/115 V, 230 V, 115 V 60 Hz: 480/277 V, 440 V/254 V, 240 V/139 V, 208/120 V, 240 V, 120 V |
| Pole count | 2 or 4 pole |
| Excitation system | Shunt/PMG |
| AVR | Shunt standard: AS540, SX460 and similar; PMG standard: MX341*; optional: digital AVR |
| Phases | Three phase, single phase on request |
| Connection | Star (Y) or Delta (D) |
| Insulation class | Class H |
| Protection rating | IP23 standard, IP44 or IP54 optional |
Who buys, and what to confirm before you order
Who buys
Telecom site builders, small standby integrators, and importers who fit alternators into compact single-phase or three-phase sets.
What the machines are used for
Small telecom backup units, light commercial standby, portable and towable sets, where the alternator has to fit a frame that was designed around the engine rather than the other way round.
What you need to confirm before you order
- Single phase or three phase. It decides the output arrangement and what you have to confirm to us.
- The engine speed the alternator must run at, and the frequency it has to hold (50 Hz or 60 Hz).
- The mounting style: single-bearing SAE flange or double-bearing, and the shaft and housing dimensions your engine uses.
- The ambient temperature the set will work in. Heat at the alternator reduces the output you can rely on.
- Whether the single phase output comes from a reconnected three phase winding or from a winding built that way.
Where the configuration differs
Winding and voltage
At this size the common arrangements are single phase and the lower three phase voltages. A three phase machine can often be reconnected for a single phase output, which is cheaper than ordering a separate winding. We confirm against your electrical drawing.
Mounting
A single-bearing unit bolts straight to the engine housing and takes the alignment load with it. A double-bearing unit sits on its own bracket and carries the full belt or coupling load. The choice follows your engine.
Enclosure
Open frame, canopy and container each move the air differently. The enclosure decides how the alternator is cooled and how much space is left for ducting and connections.
What affects your quote
- Power and frequencyMachine rating in kVA and load in kW confirmed separately, at 50 Hz or 60 Hz.
- Voltage and winding optionStandard winding or a special voltage, and how many different voltages the set has to carry.
- Mounting and mechanical interfaceSingle-bearing SAE or double-bearing, and how it mates to your engine and its housing.
- Excitation and short-circuit supportWhether your application needs stronger short-circuit support than the standard arrangement.
- Quantity and delivery batchUnits per order, and how many batches you want us to schedule.
- Delivery point and trade termsDestination port, and how shipping, insurance and clearance are split between us. EXW, FOB, CIF and DDP can all be quoted.
Request technical documentation
Send your requirements - a written reply within 24 hours, a selection scheme within 48.
Typical lead time and indicative budget will be confirmed in the formal quotation.
Where to go next
Mounting: single-bearing or double-bearing
The arrangement decides the flange, the bearings and the alignment. It is the one decision that cannot be changed later.
Eight application scenarios
From data centres to marine sets: the load and the conditions that decide the build in each of them.
kVA vs kW: why we ask for both
The two numbers look interchangeable and are not. The difference is what a quotation is built on.
How we inspect and ship
What is checked before the machine leaves, which documents travel with it and how the loading is planned.