Fast changeover

Some loads cannot be off for long. The machine and the transfer arrangement are specified together, and the time is written down as an acceptance item.

How the machine is configured against this condition

Data centres, hospitals
Fast changeover
English nameMillisecond Changeover Emergency Power
Core problemWhen the mains fails, critical loads cannot be left without power for long. If the set is slow to build voltage, or the changeover does not match the set, fire systems, medical equipment or data equipment stop, and data can be lost.
SolutionA fast-response excitation system shortens the time the machine needs to build voltage, and an automatic transfer device completes the changeover, so important loads are back within the interruption time that has been allowed.
Typical applicationsData centres, hospitals, fire pump houses, financial machine rooms, rail stations and communication hubs.
Selection points
  • A fast automatic transfer device, and the machine held ready at operating temperature.
  • The excitation response and the voltage build-up time written into the specification.
  • Both written down as acceptance items rather than as expectations.
  • The transfer arrangement and the machine confirmed with each other.

Where to go next

Excitation: how the alternator makes its field

Build-up time is part of the excitation, and part of the answer.

Data centres

Loads that do not stop for a second.

Buildings with a transfer arrangement

The building's own transfer arrangement, and the machine behind it.

Choose the power band

Changeover sets sit where the load is.

Chat on WhatsApp Business

Ask us

Answers come from published selection notes, not from a catalogue.

Request a quotation

We reply to every enquiry within 24 hours, and a selection scheme follows within 48.