Selection guide
How to specify an alternator for a genset
A genset alternator is specified by conditions, not by a model number. The same machine can be right for one project and wrong for another, and the difference is almost never the size. This is the order to settle the conditions in, and what each one changes.
Start with the engine, not with the machine
The most common way a requirement goes wrong is that it starts with a size. A number chosen first, and the conditions filled in afterwards, produces a machine that fits the paper and not the site.
The engine is the right place to start, because it fixes three things at once: the speed the machine has to run at, the number of poles the winding needs to produce the frequency you want, and the mechanical interface the alternator has to mate with. A flange that does not match is not a problem that can be solved later in the project.
So the first question is not how big, but what is driving it, and how it is coupled.
Then the duty
Duty is the second question, and it is the one most often answered with a shrug. A machine that runs all day and a machine that starts when the grid fails are held to different standards, because the heat build-up in the first case is continuous and in the second case is brief. The rating basis, the insulation margin and what the machine can be asked to deliver in an emergency all follow from which one you are buying.
If the set is a standby set that also does a weekly test run, say so. It changes what the answer is.
Then the environment
The machine is rated against a reference ambient temperature, and above that reference the output it can deliver falls. The same applies to altitude: the air is thinner, less of it reaches the machine, and less heat can be moved away.
Neither of these is a detail to be settled after the order. They change the rating, and the rating changes the machine. If the site is hot, dusty, or high, say so at the start, because the answer is a different machine rather than a smaller one.
Then the grid
Frequency follows the grid and voltage follows the network. The usual arrangements cover the usual voltages, and a site that runs on something else needs a different winding rather than an adaptor.
While you are there, say how much of the load is electronic. Electronic load steps and draws harmonics in a way conventional motor load does not, and it changes how the machine holds voltage through a step and how it behaves under a fault.
Then the protection
This is the question that separates a quotation that works from one that comes back. If the board has to discriminate between circuits, or if more than one set works in parallel, the excitation arrangement is not a detail and cannot be left to default.
Most single sets on their own board are happy with the simplest arrangement. A board with several sets, or with selective coordination, is not.
Then the order
Quantity, destination and date. These change the price and the shipping plan, and a quantity split across sites or across deliveries changes it more than the size does.
The trade term matters too, because it decides what is included, what is not, and who carries the risk at each point along the way.
What to send us
The useful part of a requirement is short: the machine rating, the running load, the duty, the frequency and the site conditions. We will ask for the rest as well, because the rest is what stops a machine arriving that cannot do the job.