Synchronous AC alternators 500 - 1000 kVA

Heavy industrial machines, where cooling, interface and the number of sets on one board start to decide the design.

500 - 1000 kVA · 50 Hz / 60 Hz · 4, 6 or 8 pole · Shunt/PMG

Single-bearing on an SAE flange, or double-bearing on a coupling. The two mounting arrangements

What this band covers

Medium-large band, 500 - 1000 kVA
Medium-large - 500 - 1000 kVA
IndicatorParameter
Power range500 - 1000 kVA
Frequency50 Hz / 60 Hz
Rated voltage50 Hz: 400/230 V, 415/240 V, 380/220 V, 220/115 V, 230 V, 115 V
60 Hz: 480/277 V, 440 V/254 V, 240 V/139 V, 208/120 V, 690/400 V, 240 V, 120 V
Pole count4, 6 or 8 pole
Excitation systemShunt/PMG
AVRLow-voltage PMG standard: MX341*, MX341B*; low voltage optional: digital AVR; medium voltage: digital AVR
PhasesThree phase
ConnectionStar (Y) or Delta (D)
Insulation classClass H
Protection ratingIP23 standard, IP44 or IP54 optional

Who buys, and what to confirm before you order

Who buys

Large genset manufacturers, EPC contractors, and power plant integrators assembling multi-machine packages.

What the machines are used for

Heavy industrial standby, continuous duty plant power, and packages where several machines share a board and have to share load.

What you need to confirm before you order

  • The rated output in kVA and the running load in kW, confirmed separately, and the starting demand of the largest load.
  • How many machines work together, how they share load, and how the protection coordinates between them.
  • The engine speed and the number of poles the drive can work with.
  • The cooling arrangement: open, packaged or containerised, and where the heat is rejected.
  • The ambient temperature, the altitude, and the hours the machine is expected to run per day.

Where the configuration differs

Winding and voltage

A package at this size often carries several voltage arrangements at once, and the phase count and the connection are fixed by the installation rather than chosen freely.

Cooling and enclosure

At this size the cooling path is part of the machine. Open, packaged and containerised arrangements move the heat differently, and the choice affects the room it goes into.

Mechanical interface

Double-bearing drive with an explicit coupling and alignment procedure is the usual arrangement here, because the machine and the engine are separate items that have to match.

What affects your quote

  1. Power and frequencyMachine rating in kVA and load in kW confirmed separately, at 50 Hz or 60 Hz.
  2. Voltage and winding optionStandard winding or a special voltage, and how many different voltages the set has to carry.
  3. Mounting and mechanical interfaceSingle-bearing SAE or double-bearing, and how it mates to your engine and its housing.
  4. Excitation and short-circuit supportWhether your application needs stronger short-circuit support than the standard arrangement.
  5. Quantity and delivery batchUnits per order, and how many batches you want us to schedule.
  6. Delivery point and trade termsDestination port, and how shipping, insurance and clearance are split between us. EXW, FOB, CIF and DDP can all be quoted.

Send your requirements - a written reply within 24 hours, a selection scheme within 48.

Typical lead time and indicative budget will be confirmed in the formal quotation.

Where to go next

Mounting: single-bearing or double-bearing

The arrangement decides the flange, the bearings and the alignment. It is the one decision that cannot be changed later.

Eight application scenarios

From data centres to marine sets: the load and the conditions that decide the build in each of them.

kVA vs kW: why we ask for both

The two numbers look interchangeable and are not. The difference is what a quotation is built on.

How we inspect and ship

What is checked before the machine leaves, which documents travel with it and how the loading is planned.

Chat on WhatsApp Business

Ask us

Answers come from published selection notes, not from a catalogue.

Request a quotation

We reply to every enquiry within 24 hours, and a selection scheme follows within 48.