Connecting the world to reliable power
Buyer type
Synchronous alternators for industrial power equipment
Where the site decides what the machine can deliver. Heat, altitude and the cooling path belong in the requirement, not in the assumptions.
Who this is for
Who buys in this application
Suppliers of industrial power equipment, manufacturers building industrial packages, and contractors integrating power systems into plants, sites and facilities.
The requirement
What you need to confirm before you order
These are the conditions that change the machine, in the order they are usually answered.
- The machine rating in kVA and the running load in kW, confirmed separately.
- Site altitude, and the highest ambient temperature the equipment will see.
- Whether the alternator sits inside a container, under an acoustic canopy, or in a plant room with its own ventilation.
- The electrical arrangement: voltage, phases, and how the installation changes from one site to the next.
- Dust, sand or humidity at the site, and the enclosure type that goes with them.
- How often the machine runs: continuously, on standby, or on a mixed duty.
Common mistakes
Three things that go wrong here
Not warnings - just the failures we see most often, and what to do about each one.
Site conditions left out of the requirement
Altitude and ambient temperature both reduce what an alternator can deliver continuously. A machine specified without them is a machine sized on paper, and the shortfall shows up on site.
The cooling path assumed rather than designed
Inside a container the air has one route, and that route is decided by the container drawing. Agreeing the alternator position and the cooling arrangement together avoids a rework at the loading stage.
One machine sized for every site
A package that goes to three sites usually meets three different conditions. Splitting the requirement by site is cheaper than splitting it after manufacture.
Power bands
Choose the band
Reading