Synchronous alternators for EPC contractors and project owners
Standby power bought as a project, not as a unit. The package has to arrive, be assembled and perform on the first start.
Who this is for
Who buys in this application
EPC contractors, project owners and facility operators who buy per project rather than machine by machine. The machines have to arrive, go in, and perform on the first start.
The requirement
What you need to confirm before you order
These are the conditions that change the machine, in the order they are usually answered.
- The standby duty, and the load each machine has to carry.
- How many machines are in the package, and whether they run together or independently.
- The delivery and assembly sequence, including where the machines are stored between arrival and installation.
- The ambient conditions at the site, and whether the machines sit inside or outside.
- The local requirements for importing and operating the equipment, which we flag early.
- The documentation you need on delivery, and where each piece has to come from.
Common mistakes
Three things that go wrong here
Not warnings - just the failures we see most often, and what to do about each one.
The package planned without an installation sequence
If the machines are unloaded in the wrong order, the site ends up moving heavy equipment twice. We plan the loading around the order you will install in.
Access and lifting settled on site
A machine that cannot be lifted, carried through a door or positioned on its foundation is a machine that cannot be commissioned. Access points are agreed before manufacture.
Import requirements discovered late
Documents that sit on your side - a letter of credit, an import licence, a tax registration - are the usual reason a shipment waits at the port. We ask for them early.